Boots

Only the best for Boots!

The challenge

Boots needed to find a way of doubling their loading capacity on a very tiny site with limited room for lorries to manoeuvre.

 

The solution

To design & install a temporary wall-mounted building with roller shutter door that allowed for two lorries to be loaded at the same time.

Key facts 

  • Limited space
  • Wall-mounted loading bay
  • 6.5m(w) x 6m(l) x 4.3m(h)
  • Roller Shutter
  • Rear loading

Project overview

Boots needed to double loading capacity at their warehouse in Greenwich, which is a very old building situated on a tiny site.  In spite of the limited space, we needed to design a structure that could enable lorries to be rear-loaded as it was important that they were kept insulated.  At the same time, it was imperative that this structure did not restrict access so that more than one lorry could still drive in and out with ease.  Only a CopriSystems temporary building was going to do the job for the UK’s leading health and beauty retailer!